Crib Point Jetty - Port of Hastings (2010). This was built in 1966 for $7m and included a two-berth marine terminal with capacity for tankers up to 100,000 tons - Tyabb Havaalanı fotoğraf galerisi Panoramio at

tek sayfa görüntüle fotoğraf Galerisi Tyabb Havaalanı
Orijinal resim (yeni pencere) görüntüle
Muzza from McCrae, 27 August 2010